What if the trees had been seriously diseased?
MP25 · trees · technical timeline
Botanical report
MP25 had been justified for months in part by preserving two mature pine trees. The specific municipal report on their condition and transplant viability was requested on 10 June 2026, when the amendment was already in its final stage.
Legal caution. This page does not claim that the report is false or manipulated. It asks why the specific technical assessment was not obtained at the beginning.


Questions
The planning came first. The specific check came later.
What alternatives were studied before changing the plan?
Why was the report not requested at the beginning?
Were there earlier studies that are still not public?